Our custodians have been working hard this summer getting ready for the start of school. We have two fantastic custodians and they do a great job...
North hallway at Lewis
in Random
Our custodians have been working hard this summer getting ready for the start of school. We have two fantastic custodians and they do a great job...
I played with this image in Snapseed on the iPad...
I ride by these two tree just about every work day...
Last week, the City of Portland began work on the construction of some pedestrian improvements near Lewis Elementary School. Sidewalk installations have begun on SE 45th avenue at locations that previously did not have sidewalks. This includes a section of sidewalk directly north and south of our crosswalk on SE 45th and Evergreen. In addition it looks as if a pedestrian island is being installed at SE 45th and Glenwood, and a section of sidewalk is being installed just north of Glenwood on SE 46th. These improvements will make it easier and safer for students and their families to walk and bike to and from Lewis.